Steam systems forfactories that can’t stop.

Specify a new boiler, source a critical spare or dispatch a certified engineer — one team from site survey to annual inspection.

Packaged horizontal industrial steam boiler rotating to show its shell, burner, controls and access platform.

Companies we work with

Compliance

Licensed and certified

Registered with the Office of the Chief Inspector of Boilers, working to the Boiler Act 1923.

Field coverage

Nationwide coverage

Dhaka, Gazipur, Savar, Narayanganj, Cumilla and Chattogram.

Response

Breakdown response

On-call teams for burner lockouts, feed pump failures, tube leaks and steam leaks.

Local supply

Parts held in stock

Burners, flame sensors, safety valves, traps, gaskets and feed pumps from our Dhaka store.

01Equipment

Steam boilers built for continuous factory load

Fire tube, water tube, biomass and heat recovery units, sized from your measured steam demand and the fuel you can actually get.

3-Pass Wetback Fire Tube Industrial Steam Boiler

3-Pass Wetback Fire Tube Industrial Steam Boiler

High-efficiency three-pass wetback horizontal fire tube industrial steam boiler with monoblock burner and side steam manifolds.

Output
1.0 Ton/hr to 20.0 Ton/hr (1,000 to 20,000 kg/h)
Pressure
10 Bar, 13 Bar, 16 Bar, 20 Bar (up to 25 Bar)
Gas passes
3-Pass Full Wet-Back Design
Efficiency
92% - 95% (with standard integrated economizer)

02Spare parts

Spare parts and steam auxiliaries

38 line items across 8 categories, held in our Dhaka store or sourced direct from the original manufacturer.

One steam system. One accountable team.

Supply, installation, certification and service stay connected from first firing onward.

Stainless steel packaged steam boiler rotating to show its inspection platform, feedwater tank, smokebox door, flue outlet, control stack and skid-mounted pipework.

03Service

Inspection, repair and breakdown service

One team for annual certification, planned shutdown work, water treatment and emergency call-out.

Annual inspection and certification

  • Hydraulic pressure testing at 1.5 times design pressure
  • Ultrasonic thickness gauging of shell, furnace and tube plates
  • Safety relief valve bench calibration, pop testing and sealing
  • Inspection book endorsement and certificate renewal

Emergency breakdown response

  • Burner lockouts, ignition faults and flame sensor failures
  • Feed pump trips, level controller and float switch faults
  • Steam leaks at manhole gaskets, flanges and valve glands
  • Gas train regulator drift, solenoid and draft switch errors

Shutdown, retubing and refractory

  • Fire-side soot cleaning, tube brushing and full retubing
  • Refractory casting and insulation at front and reversal doors
  • Economiser, soot blower and air preheater servicing
  • Blowdown valve overhaul, seat lapping and steam trap repair

Feedwater treatment and deaeration

  • Softener resin replacement and regeneration setup
  • Dosing pump servicing for oxygen scavenger and scale inhibitor
  • TDS testing and automatic surface blowdown settings
  • Internal scale, pitting and embrittlement inspection

04Industries

Steam systems matched to your process

Pressure, dryness and fuel choice change with the plant, so each system is specified around the machines it feeds.

Industrial water tube steam boiler installed in a manufacturing plant.
Boiler rating, header manifold and feedwater skid are matched to the factory's own equipment list.
  • Textile dyeing, washing and finishing

    6–10 bar

    Steady header pressure for stenters, jet dyeing vessels, hydro extractors and compactors, sized so simultaneous batch fills do not cause a drop.

  • Pharmaceutical and clean steam

    3–6 bar

    Utility steam for water for injection stills, autoclave sterilisation, reactor jackets and cleanroom humidity control.

  • Food, edible oil and beverage

    4–8 bar

    Process heat for pasteurisers, jacketed kettles, clean-in-place sanitation on bottling lines and edible oil refining.

  • Paper mills and corrugated packaging

    8–14 bar

    High temperature supply for single facers, double backers, corrugating rolls and drying cylinders under fast speed changes.

  • Chemical and resin processing

    6–16 bar

    Headers for jacketed reactors, distillation columns, reboilers and steam tracing, with pressure reducing stations at each stage.

  • Rice parboiling and feed mills

    4–10 bar

    Biomass, husk or gas fired units for parboiling tanks, pellet conditioner steam injection and rotary grain dryers.

05Process

How a project runs

From the first site visit to certification and handover, with the same engineers throughout.

  1. Site survey and steam audit

    We record normal and peak demand in kg/hr, working pressure, available fuel, feedwater chemistry and the space the boiler house has.

  2. Engineering and specification

    Capacity, burner modulation, deaerator, blowdown recovery, safety valves, chimney and pipe routing are drawn up as one package.

  3. Installation and commissioning

    Certified welders run the steam piping and flue stack. We complete first firing, combustion tuning and full load testing.

  4. Certification and support

    We arrange the statutory hydraulic inspection, train your operators and stay on call once the plant is running.

06Questions

Common questions

Practical answers for factory owners, utility managers and chief engineers.

How do you size a steam boiler for a textile dyeing factory?

Dyeing lines swing hard when several machines fill at once, so nameplate figures are not enough. We run an on-site steam survey to measure peak against average consumption in kg/hr, the working pressure (usually 6 to 10 bar) and how much condensate returns, then size the boiler and accumulator from those readings.

How often does an industrial boiler need inspection in Bangladesh?

Every steam boiler must be inspected and certified each year under the Boiler Act 1923. That includes a hydraulic test at 1.5 times design pressure and a valid certificate from the Office of the Chief Inspector of Boilers. We carry out the testing, prepare the documents and handle the renewal.

How quickly can you attend a breakdown?

We keep engineering teams and stocked service vans for Gazipur, Savar, Ashulia, Narayanganj and Chattogram, so a burner lockout, feed pump failure or tube leak is usually attended the same day. Call the breakdown line and an engineer will talk through the fault while a team is dispatched.

Can you convert a boiler from diesel or furnace oil to gas or biomass?

Yes. We supply and install dual fuel monoblock burners, gas train valves and biomass or coal feeding retrofits. Every conversion includes draft fan adjustment, refractory modification and the safety approvals needed before the boiler returns to service.

Why does feedwater treatment matter so much?

Groundwater across Bangladesh carries high calcium and magnesium hardness along with dissolved oxygen. Without softening and oxygen scavenging, scale builds on the tubes within months, which drives up fuel use, overheats the metal and eventually splits tubes.

Which spare parts do you hold in stock?

Our Dhaka store carries burners, UV flame scanners, sequence controllers, gas multibloc valves, vertical multistage feed pumps, spring loaded safety valves, thermodynamic steam traps, spiral wound gaskets and seamless carbon steel boiler tubes.

07Contact

Request a quote

Send your steam demand in kg/hr, working pressure in bar and the fuel available. An engineer replies with sizing and pricing.

Breakdown line
+880 1712 345678

Quoting Combination Gas MultiBloc Valve Train AssemblyINST-GAS-MBLK01Clear

For example: 4,000 kg/hr at 10 bar for a dyeing expansion in Gazipur, natural gas available.