Industrial steam engineering, registered across Bangladesh

Prepare the plant before the inspector arrives

Certificate renewal is easier when the boiler, mountings and records are reviewed before the inspection date. We inspect the pressure parts and safety devices, identify work that could delay the visit, and agree a shutdown scope with the factory team.

MK Boiler Solution is listed by the Office of the Chief Inspector of Boilers as a Boiler Repairer Organisation. We support factories with inspection preparation and repairs; the statutory inspection and certificate decision remain with the responsible government authority.

Boiler inspection and certificate-renewal support
Service area
Industrial sites across Bangladesh
Best time to call
Before the planned shutdown
Deliverable
Findings and corrective-work scope

Boiler services

Inspection-preparation scope

  • External and accessible internal condition review
  • Pressure gauge, water-level and safety-device checks
  • Hydraulic-test preparation and test-equipment coordination
  • Tube, gasket, valve and refractory defect identification
  • Repair planning against the inspection date
  • Support assembling the available boiler records and test results

01 — 04

How the renewal support runs

  1. 01

    Review

    We confirm the boiler identity, certificate status, known defects and proposed shutdown window.

  2. 02

    Prepare

    The team opens, cleans and checks the boiler, then lists any corrective work needed before testing.

  3. 03

    Test and repair

    Required tests are coordinated and repairable findings are closed out by the relevant trade.

  4. 04

    Handover

    The factory receives the work record and available test documentation for its renewal file.

06Questions

Common questions

Practical answers for factory owners, utility managers and chief engineers.